The diversion path at the top of the waterfalls has now been repaired and is ‘crossable with care’ – i.e. it is reinstated but is very muddy (not alone in that as there has been a lot of rain recently).

IMG_20160124_093406198

IMG_20160124_093610069

Sunday today so I took a look at both top and bottom. At the top, the large pipe is laid out down the hillside, and the concrete mini-dam at the top has now been formed in the river and the wooden housing removed.

IMG_20160124_095924236

At the bottom, large numbers of trees have been felled and the foundations have been laid for the powerhouse.

IMG_20160124_105053994

IMG_20160124_105103306_HDR